|
Search Results
|
|
|
|
Acronyms (0)
|
|
|
|
DoD Dictionary (1)
|
|
|
|
Searched in 0.000 seconds
|
|
|
random acronym
random DoD term
|
|
|
|
|
D-to-P assets required on D-day | |
As applied to the D-to-P concept, this asset requirement represents those stocks that must be physically available on D-day to meet initial allowance requirements, to fill the wartime pipeline between the producers and users (even if P-day and D-day occur simultaneously), and to provide any required D-to-P consumption or production differential stockage. The D-to-P assets required on D-day are also represented as the difference between the D-to-P materiel readiness gross requirements and the cumulative sum of all production deliveries during the D-to-P period. See also D-to-P concept. Source: US DoD Joint Publication 1-02, DOD Dictionary of Military and Associated Terms (as amended through 9 June 2004). |
|
|
|
|
|
|
|
|
|